25-04-2022, 05:58 PM
(25-04-2022, 05:52 PM)BlueArmy Wrote: https://youtu.be/DwTZBxO61M0
Seems they are really pleased with the current works with the North stand, south stand and milton end to get capacity up to 20.000. Says it will be a big improvement when done.
Kept talking about network rail re new North stand, and that it may be built when in prem ffs. Dissapointing. I hope its in the championship and network rail are on board ASAP.
Lots of work being done on the training ground they have said and that will show in the coming months.
Not enough land currently at the training ground to get academy to category 2 status and they didn't seem interested in the academy from how I read them. Very dissapointing.
Seems to me to get.much more than 20k we need network rail on-board. Maybe we could get a bit above that without them maybe 22k or so but for a significant increase we need network rail.
Not overly impressed with the interview, more so dissapointed if anything.
I'm hugely unimpressed with them. 20,000 capacity whoopidoo. Well never get to the premier league with these owners because they won't spend the money if we get to the Championship. So we'll be stuck with a redeveloped stadium with limited capacity for the foreseeable.
Also they realise it's unacceptable to be where we are in the league and we've failed this season, therefore logically Danny Cowley won't be here next season.. ?